- Schedule lines are not created by MRP, instead planned orders or purchase requisitions are created
1967840 - MRP does not create schedule lines - Schedule lines are not displayed in MD04
Check the reduced quantity in field EKET-DABMG. If it is equal or larger than the schedule line quantity, the schedule line is not displayed in MD04.
If you still don't know why, you may try to debug by setting a breakpoint at form PRUEFEN_MDBS of program SAPLM61X. Refresh MD04 list. The debugger will stop at the breakpoint. - Schedule lines are shown as firmed in MD04
2088322 - Schedule lines are displayed with an asterisk ( * ) in t-code MD04/MS04 - Vendor is wrong
MRP: Vendor is not selected and general problems on source determination - Stock transport delivery date is not correct
361308 - Stock transf.releases:Scheduling via plnd dely time
76301 - Scheduling stock transport order/PReq - Multiple / redundant schedule lines are created
1745312 - MRP creates redundant proposals though there are fixed future receipts which can cover the requirements. - Duplicate / double schedule lines on the same date
2108166 - Duplicate schedule lines are created with the same date by MRP
↧
Problems related to MRP created schedule lines
↧